Key Facts

  • Client Name:
    Odette Ventures
  • Principal Contractor:
    Swift Crafted Ltd
  • Architect:
    Clague Associates
  • Address:
    The White House
    Coombe Park
    Kingston
    KT2 7JD
  • Value of Works:
    £596,000
  • Start Date:
    November 2010
  • End Date:
    August 2011

Scope of Works

Construction of a 3 storey building as an extension to the existing house incorporating a swimming pool and Jacuzzi to the basement. Works incl excavation, concrete foundations, walls, floors and columns. Brick/block work walls including render externally. Floors screeded internally. Steel frame elements. Traditional timber roof construction incl dormers and roof lights. Hardwood sash windows and hardwood conservatory to the rear. New underground drainage including manholes.

The existing house was fully refurbished – works included demolition of existing walls, new structural steels to support new construction, block & beam floors, screed to floors, plastering to walls and ceilings, fibrous plaster cornices, new hardwood doors and frames, Hardwood skirting’s, marble and granite floor and wall tiling to kitchen and bathrooms and ensuites, hardwood timber flooring ,new hardwood joinery to bedrooms and bathrooms, French polishing to existing and new joinery items, decoration to walls & ceilings internally and to the whole house externally.


White House Gallery

  • British Safety Council
  • Achilles
  • WCS
  • Timber Trade Federation
  • Timber Trade Federation Responsible Purchaser
  • SCSSilver
  • Contractors Health and Safety Assessment Scheme
  • IFC
Copyright © 2013-2017 Swift Crafted Ltd. All Rights Reserved. No portion of this site may be copied without the express written consent of Swift Crafted Ltd.