Ref Project Client Value Programme Scope of Works Status Contact
224 Finsbury Circus, EC2 Bovis Lend Lease £1.86M Jul 05-Jun 08 Office Refurbishment, Joinery Works & Windows Completed Andy Leigh - Project Manager, Philkinson - Quantity Surveyor
228 Tooley Street, EC1 Crisp Interiors £171K Apr 06-Aug 06 Joinery & Builderswork Completed Steve Simmons - Project Manager; Michaela Mc George - Quanity Surveyor
232 Wood Street, EC2 Bovis Lend Lease £585K Jun 06-Jul 07 Office Refurbishment - Doors Ironmongery etc. Completed Phil Clarke/Russell Bond - Project Managers
233 International House, WC2 Como Construction £491K Jul 06-Feb 07 Carpentry, Joinery, Toilet Fit Out & Raised Floors Completed Chris Emmett - Project Manager; Peter Hill - Quantity Surveyor
239 REISS Headquarters, W1 Como Construction £83K Jun 07-Sep 07 Structural Timber Completed Andrew Wilson - Project Manager; Adrian Yong - Quantity Surveyor
243 7-10 Old Bailey, EC4 Bowen plc £900K Aug 08-Jan 09 Joinery & Toilet Fit Out Completed Peter Jenkins - Project Manager; Kate Collins - Quantity Surveyor
242 Kingsgate House, Redhill Bowmer & Kirkland £320K Feb 08-Dec 08 Doors, Frame and General Joinery Completed David Langlands - Project Manager; Peri Zagaretos - Quantity Surveyor
247 The Strand, WC2 Redwing Construction  £74K Jul 08-Sep 08 Joinery, Door Installation, WC Fit Out & Ancillary Carpentry Works Completed David Torrel - Project Manager; Steve Barnham - Quantity Surveyor
248 Museum of Garden History, SE1 Redwing Construction £82K Jul 08-Sep 08 Joinery Works Completed David Torrel - Project Manager; Steve Barnham - Quantity Surveyor
244 Fenchurch Street, EC3 Mace Plus £1.03M Sep 08-Mar 09 Toilet Fit Out & Joinery Completed Darren King - Project Manager; Shaun Grazette - Quantity Surveyor
254 Gracechurch Street, EC2 Costain £85K Aug 09-Oct 09 Masard Roof and Timber Dormers Completed Mark Sowerby - Project Manager; Lee Morrissey - Package Quantity Surveyor
266 Syon Park Hotel, Middlesex Bowen £890K Sep 09-Mar 11 Carpentry Joinery & Cladding to Hotel Link Bridge, Fit Out Completed David Goward - Project Manager; Joe Raj - Quantity Surveyor
273 Crawley Galliford Try £435K May 11-Jun 12 Joinery, Door Installation, WC Fit Out & Ancillary Carpentry Works Completed David Goward - Project Manager
301 BSkyB - Fitness Centre Mace £410K Mar 15- July 15 Internal Joinery, Metal Work, WC and Shower Cubicles, IPS Panelling and Cycle Racks Completed Carl Barr - Project Manager; John Hedden - Quantity Surveyor
306 Jermyn Street Szerelmey £188k Sep 15 - Jan 16 Complete refurbishment of existing roof Completed Tuffin Ferraby Taylor - Construction Consultant
307 London Wall Brookfield Multiplex April 16 - Joinery, Ironmongery, Signage - Design & Build Ongoing Aidan Lucas - Project Manager; Antony McSharry - Project Surveyor
308 Basingstoke Police Investigation Centre Mace Group £1.0m June 16 - Dec 16 Internal Doors, Skirting, Window Boards and Washroom Fit-Out Completed Andrew Palmer - Project Manager; Simon Griffith - Project Surveyor
314 LDP Farringdon Road Brookfield Multiplex Aug 17 - Internal Doors, Skirting & Washroom Fit Out Ongoing Elliot Dittes - Project Manager; Joyce Canonigo - Project Surveyor
316 Camden Town Hall Annexe McLaren Oct 17- Timber Doorsets Ongoing Gareth Hill - Project Manager; Clare Theobald - Project Surveyor
320 Station Road, Cambridge Galliford Try Feb 18 - Ceilings & Partitionss to offices over several floors Ongoing Gareth Hill - Project Manager; Andrew Every - Project Surveyor
322 New Eastern Police Investigation Centre Mace Group June 18- Timber & Metal Doors,Cell Furniture, desks and washroom fit-out Ongoing Andrew Palmer - Project Manager; Richard Ashman - Project Surveyor

Education Projects

Ref Project Client Value Programme Scope of Works Status Contact
141 Royal Academy of Dramatic Arts, London Laing £824K 2000 Carpentry, Joinery, Doors, Wood Flooring and Panelling Completed Brian Wolding - Quantity Surveyor
153 Millennium School & Health Centre, Greenwich, SE10 Wates Const £351K 2001 External Timber Cladding Completed Andy Wall; Nigel Smith
181 Priors Court School The Andrews Partnership £141K 2001-2002 General Refurbishment of the Early Years Centre(2 no. Buildings) Completed Laura Brampton
189 Charterhouse School Godalming, Surrey GTCM £227K Jul 02-Sep 02 Joinery Refurbishment of Dormitary's Completed Andrew Healey - Quantity Surveyor
230 John Madejski Academy, Reading Costain £716K Jul 06-Jan 07 Doors, Frame and General Joinery Completed Richard Tranter - Project Manager; Alan Kittles - Quantity Surveyor
253 Teddington Secondary School Mace Plus £1.32M Jul 09-Aug 10 Kerto Roofing, General Joinery and WC Fit Out Completed John Fraser - Project Manager Liam Donoher - Quantity Surveyor
256 Wren Academy Galliford Try £428K Jul 09-Sep 10 General Joinery and External Timber Cladding Completed Vince Sherwin - Project Manager Andrew Every - Quantity Surveyor
262 Garth Hill College Mace Plus £1.2M Oct 09-Sep 10 Doors, Joinery, Screens Windows and Tiling Completed Alistar Kendall - Project Manager, Ryan King - Quantity Surveyor
263 Sainsbury Laboratory Kier/Cambridge University £1.7M Mar 10-Feb 11 Timber/Metal Door Sets, Joinery, Panelling Completed Nick Mann - Project Manager; Iain Cox - Quantity Surveyor
265 OMPI (Oxford Molecular Pathology Institute) Mace Plus £450K Aug 10-Dec 10 Doors, WC fitout, Cedar furniture Completed Phil Hilton - Project Manager, Tom Hunter Quantity Surveyor
270 University of Hartfordshire (Hatfield) ISG £210K Feb 11-Jul 11 Doors, Acoustic Wall Panels, general Joinery Completed James Barbwell - Project Manager, Michael Dempsey Quantity Surveyor
275 Waltham Forest Mace Plus £2.2M Jul 11-Sep 11 General refurbishment of 4 separate school buildings Completed Andrew Palmer - Project Manager, Lance Lucas - Quantity Surveyor
278 Southfields Community College 1st Phase Lend Lease £400K Jul 12 - Jan 13 Doors, glazed screens, desks,display cabinets, seats Completed Roger Hirst - Project Director
282 Southfields Community College 2nd Phase Lend Lease £330K Jul 13 - Feb 14
Doors, glazed screens, desks, display cabinets, seats Completed Roger Hirst - Project Director
285 Barnet Schools Phase 1
Mace Plus £730K Jul 13- Aug 13
M&E, roofing, plastering, flooring, ceilings, partitions, door sets, cubicles, wall tiles and decoration Completed
288
Barnet Schools Phase 2-5
Mace Plus
£717k
Dec 13- Apr 14
Carpentry & Joinery
Completed
Ian Thomas - Project Manager, Liam Donoher - Quantity Surveyor
296 ARK Academy
Lend Lease £575K Nov 14- July 15
Internal Joinery and Tiling Completed John Fifield - Project Manager, Max Atkinson - Quantity Surveyor
298
St John Bosco College
Lend Lease
£485k
Nov 14-Sep 15
Cedar Cladding to Sports Hall Curved Timber Chapel Wall and Internal Joinery Completed John Trainer
299 Marlborough Interim School
Mace
Completed Roy Conway
304 Exeter College Oxford Mace £1.25m April 16 - April 17
Joinery including Panelling, Doors and Glazed Screens Completed Garrett Wier - Project Manager
310 Big Data Institute Oxford
Mace £1.1m May 16 - Feb 17
Timber Panelling, Internal Doors & Bespoke Joinery Completed Phil Hilton - Project Director Liam Donoher - Quantity Surveyor
313 New Marlborough School & Commercial Building Mace £1.36M Feb 17 - Sep 17
Joinery including Acoustic Panelling, Doors, Reception Desk & Washroom Fit-out Completed James Cain - Project Manager
318 Oxford Amenities, Project 696
Mace Commencing Feb 18
Internal Carpentry & Joinery Ongoing Robert Cocks - Project Director David Vinton - Quantity Surveyor
321 UCL New Student Centre Mace June 18 -
Reception Desk, gazed Screens, changing benches, tea points,Cafe Servery & Washroom Fitout Ongoing Craig Herbert - Project Manager, Steven Anderson - Project Surveyor

Airport Projects

Ref Project Client Value Programme Scope of Works Status Contact
217 Gatwick Pier 1 Rokbuild Ltd 134K Apr 04-Nov 04 Carpentry & Joinery Fit Out Competed
226 Heathrow T5 Baggage Accommodation Mace £839K Oct 05-Nov 07 Fit Out Completed Tonya Sanni - Project Manager; Adam Cartright - Quantity Surveyor
235 Heathrow T5 - CIP Lounge Mace £1.84M Jan 07-May 08 Doors, Frames, General Joinery and Fit Out Completed Andrew Butterworth - Package Manager; Simon Hoarsley - Project Manager;Anthony Sexton - Commercial Manager
246 Heathrow T3 - Transformation Room Morgan Ashurst £52K Apr 08-Sep 08 General Builderswork & Fit Out Completed Alan Smith - Project Manager; Neil Reynolds - Quantity Surveyor
251 Heathrow T3 - Virgin COGS Morgan Ashurst £80K Nov 08-Jan 09 General Builderswork Completed Rob Liddle - Project Manager; Richard Hawkins - Quantity Surveyor
295 AOF Snowbase (Heathrow) Mace £159K Sep 14-May 15 Internal Joinery Completed Roshan Ratnapala - Project Manager, Charles Dupigny - Quantity Surveyor

Health Authority Projects

Ref Project Client Value Programme Scope of Works Status Contact
216 Broadmoor Hospital Crowthorne Costain £2.5M Mar 04-Apr 06 Doors, Frames, General Joinery and Roof Completed Gareth Williams - Project Manager - Left Costain; Paul Houlton - Quantity Surveyor
222 Queen Mary's Hospital Roehampton Bovis Lend Lease £2.11M Nov 04-Mar 06 Carpentry and Joinery Completed Chris Howcroft; Jonathan Lossyk
221 Diamond Laboratory Building Synchrotron - Didcot Costain £600K Jan 05-Apr 06 Doors, Frames and General Joinery Completed Dave Williams - Project Manager; Alan Kittles - Quantity Surveyor
225 ISIS Laboratory, Didcot Costain £205K Jan 06-Nov 06 Doors, Frames and General Joinery Completed Agency Manager; Alan Kittles - Quantity Surveyor
231 GlaxoSmithKline Laboratory Bovis Pharmaceutical £156K May-06 to General Builderswork Completed Paul Symes - Quantity Surveyor
236 Cancer Research Facility Oxford Mace Plus £2.39M Jan 07-Jan 08 General Builderswork, Carpentry, Joinery, Specialist Furniture Completed Warren Pickance - Project Manager; Kevin Pettipher - Quantity Surveyor
259 Broadmoor Hospital Quion Contracts/ Direct £5K Jul 09-Dec 09 Refurbishment Works Completed Simon Lowe - Project Manager
280 Chelsea & Westminster Hospital - Burns & Diagnostics Ward Mace £1.2M Oct 12-Aug 13 Doors, Frames Specialist & General Joinery Completed Darren Pope - Project Manager
287 Chelsea & Westminster Hospital - Adult Burns Ward Mace £352K Oct 13 - Feb 14 Internal fixtures, Fittings and Joinery Completed Darren Pope - Project Manager

Residential Projects


Ref Project Client Value Programme Scope of Works Status Contact
173 Red Square, London Ballymore £801K 2001-2002 Carpentry and Joinery Works Completed
168 Silverthorne Triangle Bovis Construction £1.2M 2001-2002 Carpentry and Joinery Works Completed
209 199 Knightsbridge, SW1 Brookfield Multiplex £7.8M 2003-2005 Doors, Frames, General Joinery to 207 Units Timber Decking and Staircases Completed Ryan Mitchell; Steve Brown - Quantity Surveyor
238 Regent Street, W1 Sir Robert McAlpine £950K Apr 07-Jul 08 Fit Out of 7 Units Completed Geoff Teeling; Nigel Chard
249 Abbey Mill House, Reading Galliford Try £811K Sep 08-Feb 09 Carpentry & Joinery Completed Jerry Simms - Project Manager; Daniel Fox - Quantity Surveyor
269 The White House Julian Mountain £595k Nov 10-Oct 11 Sub/Super structure, and complete fitout Completed Julian Mountain - Project Manager, Richard Tait-Quantity Surveyor
286B
Foyle's Residential
Mace
£800k
Nov 13 -
Doorsets, general joinery, WC fit out and flooring
Completed

291
Harpenden
Andy Scarlett

Mar 14 - SEp 15
Superstructure and fit out
Completed

292
HMS Nelson, Portsmouth
Lend Lease
£470k
Nov 13- Jan 15
Internal Joinery
Completed
Ali Azir - Project Manager, Clive Brandon - Quantity Surveyor
293
Harpenden
Andy Scarlett

July 14 - Sep 15
Superstructure and fit out
Completed

294
Ram Brewery
Brookfield Multiplex
£443k
July 14- Nov 14
Full relocation of Nano Brewery, Marketing Suite for residentials
Completed
Kevin Lock - Project Manager, Adam Moore - Quantity Surveyor
289 Surrey Lane Appartments Lendlease £695k
Nov 14-June 15
Doorsets, general joinery, WC fit out and timber decking
Completed John Trainer
302
The Glebe
Brookfield Multiplex


Roofing Ongoing Sean Theobald - Project Manager, Kevin Coyle - Quantity Surveyor
315 Lollard Street Canary Wharf Contractors
July 17 -
Joinery and Timber Doors
Ongoing Scott Nicholas - Project Executive, Frank Cowell - Project Manager

Retail Projects

Ref Project Client Value Programme Scope of Works Status Contact
122 John Lewis, Bluewater Bovis Land Lease £1.6M 2000-2002 Carpentry, Joinery, Builderwork and Toilet Fit Out Completed Phil Clarke - Project Manager; Mark Chennery - Quantity Surveyor
162 Lexus Showroom, Tunbridge Wells N/A £84K Nov 00-May 01 Carpentry and Joinery Works Completed
196 Croydon Centrale Shopping Village Bovis Land Lease £237K Jan 03-Jun 03 Toilet Fit Out Completed John Pryce - Design Manager; Stephen Dix - Quantity Surveyor
218 Westwood Cross Thanet Carillion £466K Aug 04-Feb 05 Carpentry, Joinery and Fit Out Completed Alistair Mitchell - Project Manager
219 Mercedes After Sales Centre Woking Carillion £90K Jul 04-Oct 04 Carpentry and Joinery Works Completed Steve Clarke - Quantity Surveyor
N/A Various Tesco, Safeway and Marks and Spencer Stores Various Contractors £75K-£175K N/A Carpentry and Joinery Works Completed Warren Pickance - Project Manager; Kevin Pettipher - Quantity Surveyor
264 Daniels Store - Windsor Galiford Try £55K Jan 11-Mar 11 Carpentry and Joinery Works Completed Colin Jones
276 Clarence Street Galiford Try £22.5K Jan 12-Feb 12 Carpentry and Joinery Works Completed Ray Willis
286A Foyle's Bookshop Mace £650K Nov 13- May 14 Doorsets, general joinery and WC fit out Completed Finlay O'Sullivan - Project Manager; Ian Cruikshank - Quantity Surveyor

General Building Projects

Ref Project Client Value Programme Scope of Works Status Contact
210 HWDC, Project Wand Langley Mowlem £1.62M Oct 01-Jun 02 Doors, Frames, General Joinery and Fit Out to New Post Office Main Distribution Centre Competed Richard Tindal - Project Manager
223 Worle Magistrates Courts Weston Super Mare Mowlem £555K Jul 05-Dec 05 Doors, Frames and General Joinery to New Courthouse Completed Richard Tindal - Project Manager; Toby Conroy - Quantity Surveyor
227 Bristol Magistrates Court Bristol Mowlem/Carillion £987K Feb 06-Apr 07 Doors, Frames and General Joinery to New Courthouse Completed Pat Duggan - Project Manager; Rob Wardlkow & Brian Boden - Quantity Surveyor
237 London Library, SW1 Mace Limited £610K Jan 07-Sep 07 Fit Out Works Completed Mark Johnson; Bob Mayer
245 Denham Depot, Middlesex Carillion Highways £114K Apr 08-Jun 08 Refurbishment Works Completed Dave Roberts
252 Service Depot M25 Leatherhead, Surrey Carillion £19K Jan 09-Feb 09 Refurbishment of Toilets Completed Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor
257 Service Depot M25 Sunbury, Middlesex Carillion £40K Jul 09-Sep 09 Toilet and Kitchen Fit Out Completed Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor
258 Service Depot M25 Blunts Farm, Essex Carillion £20K Jul 09-Sep 09 Kitchen Fit Out Completed Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor
268 Negative Earth Galliford Try £60K Jul 10-Sep 10 Doors Skirtings Window boards Completed Ray Willis - Project Manager, Neil Ware - Quantity Surveyor
272 Cherwell Valley Galliford Try £110K Apr 11-Sep 11 Doorsets, WC fit out, Kitchen Fitout, general joinery Completed Ray Willis - Project Manager, Ian Wren - Quantity Surveyor
284 Salfords Custody Suite Mace £340K Jul 13 - Sep 13
Timber & Metal Door Sets, General Joinery, Specialist Desks Completed David Rogerson - Project Manager, Oliver Stent - Project Surveyor
289 The Lyric Theatre - Hammersmith Mace £700k Apr 14- Jan 15 Doorsets, WC fit out, general joinery and flooring Completed Andy Griffiths - Project Manager; Matt Wright - Commercial Manager
300 South Bank Tower Mace £1.36m Aug 15 - Apr 16
Walnut Frames & Door Sets, Glazed Partitions, Window Reveals & Casings Completed Shaun Tate - Project Manager, Joseph Gilman - Project Surveyor
317 245 Hammersmith Road Lendlease May 18 - Carpentry and Joinery John Chesters - Project Manager, James Bell - Quantity Surveyor
319 Beaverbrook Spa Leatherhead Rise Nov 17 -
Window and Door Refurbishment Ongoing Alex Wendon - Project Manager, James Stokes - Project Surveyor
324 RHS Wisley Gardens Buckingham Group July 18 - Window Boards and Doors Ongoing Bret Kanjurs - Project Manager, Paul Tilbrook - Project Surveyor

Listed Building Projects

Ref Project Client Value Programme Scope of Works Status Contact
113 Smithfield Market Taylor Woodrow £1.25M 1997-1998 Roof restoration/refurbishment Competed Pat Hannon
123 Fleet Street Kier £1.01M 2002-2003 Windows/Panelled Door refurbishment Completed Sarah Crosley
169 Finsbury Circus Bovis Lend Lease £1.5M 2006-2007 Listed façade refurbishment & new sliding windows Completed Andy Lee
131 St Johns Church Mowlem £101K 2003 Internal joinery refurbishment Completed John White
117 The Great Eastern Hotel Laing £5M 1998-1999 Internal joinery refurbishment Completed Disbanded
129 Guildford High Street Walter Lllewellyn £50K 2003 Listed façade & internal joinery refurbishment Completed David Fisher
126 Charterhouse School G & T Construction Management £214K 2003 Internal bedroom/dormitary joinery refurbishment Completed Andrew Healy
274 Hardinge Barracks Bovis Lend Lease £649K 2012-2013 External sash windows renovations and internal joinery Completed Mark Norton
277 Bodleian Library Mace £633K May 13- May 15 External Windows Renovations Completed Tim Court
281 Bodleian Library Mace £3M May 13- May 15 Timber Wall Panelling, Timber ceilings, Cabinetry, Skirtings, Meatal & Timber Door Sets, Lecture Theatre Fit Out Completed Tim Court
283 Hounslow Officers Mess Bovis Lend Lease £135K Apr 13-Sep 13 Strip-Out and Restoration Completed Mark Norton
290 Hounslow Officer's Mess Bovis Lend Lease £460K Jan 14- Jan 15 External sash window renovation and replacement Completed Mark Norton - Project Manager; Natalie Keogan - Quantity Surveyor
297 Hounslow Officers Mess Lend Lease £600K Nov 14- July 15 Internal joinery refurbishment Completed James Myers
312 Royal Opera House Rise Jan 17 - Fit-out & Joinery Ongoing Joe Hacke - Project Director; Nigel Fellows - Quantity Surveyor

  • British Safety Council
  • Achilles
  • WCS
  • Timber Trade Federation
  • Timber Trade Federation Responsible Purchaser
  • SCSSilver
  • Contractors Health and Safety Assessment Scheme
  • IFC

Copyright © 2013-2018 Swift Crafted Ltd. All Rights Reserved. No portion of this site may be copied without the express written consent of Swift Crafted Ltd.