Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
224 | Finsbury Circus, EC2 | Bovis Lend Lease | £1.86M | Jul 05-Jun 08 | Office Refurbishment, Joinery Works & Windows | Completed | Andy Leigh - Project Manager, Philkinson - Quantity Surveyor |
228 | Tooley Street, EC1 | Crisp Interiors | £171K | Apr 06-Aug 06 | Joinery & Builderswork | Completed | Steve Simmons - Project Manager; Michaela Mc George - Quanity Surveyor |
232 | Wood Street, EC2 | Bovis Lend Lease | £585K | Jun 06-Jul 07 | Office Refurbishment - Doors Ironmongery etc. | Completed | Phil Clarke/Russell Bond - Project Managers |
233 | International House, WC2 | Como Construction | £491K | Jul 06-Feb 07 | Carpentry, Joinery, Toilet Fit Out & Raised Floors | Completed | Chris Emmett - Project Manager; Peter Hill - Quantity Surveyor |
239 | REISS Headquarters, W1 | Como Construction | £83K | Jun 07-Sep 07 | Structural Timber | Completed | Andrew Wilson - Project Manager; Adrian Yong - Quantity Surveyor |
243 | 7-10 Old Bailey, EC4 | Bowen plc | £900K | Aug 08-Jan 09 | Joinery & Toilet Fit Out | Completed | Peter Jenkins - Project Manager; Kate Collins - Quantity Surveyor |
242 | Kingsgate House, Redhill | Bowmer & Kirkland | £320K | Feb 08-Dec 08 | Doors, Frame and General Joinery | Completed | David Langlands - Project Manager; Peri Zagaretos - Quantity Surveyor |
247 | The Strand, WC2 | Redwing Construction | £74K | Jul 08-Sep 08 | Joinery, Door Installation, WC Fit Out & Ancillary Carpentry Works | Completed | David Torrel - Project Manager; Steve Barnham - Quantity Surveyor |
248 | Museum of Garden History, SE1 | Redwing Construction | £82K | Jul 08-Sep 08 | Joinery Works | Completed | David Torrel - Project Manager; Steve Barnham - Quantity Surveyor |
244 | Fenchurch Street, EC3 | Mace Plus | £1.03M | Sep 08-Mar 09 | Toilet Fit Out & Joinery | Completed | Darren King - Project Manager; Shaun Grazette - Quantity Surveyor |
254 | Gracechurch Street, EC2 | Costain | £85K | Aug 09-Oct 09 | Masard Roof and Timber Dormers | Completed | Mark Sowerby - Project Manager; Lee Morrissey - Package Quantity Surveyor |
266 | Syon Park Hotel, Middlesex | Bowen | £890K | Sep 09-Mar 11 | Carpentry Joinery & Cladding to Hotel Link Bridge, Fit Out | Completed | David Goward - Project Manager; Joe Raj - Quantity Surveyor |
273 | Crawley | Galliford Try | £435K | May 11-Jun 12 | Joinery, Door Installation, WC Fit Out & Ancillary Carpentry Works | Completed | David Goward - Project Manager |
301 | BSkyB - Fitness Centre | Mace | £410K | Mar 15- July 15 | Internal Joinery, Metal Work, WC and Shower Cubicles, IPS Panelling and Cycle Racks | Completed | Carl Barr - Project Manager; John Hedden - Quantity Surveyor |
306 | Jermyn Street | Szerelmey | £188k | Sep 15 - Jan 16 | Complete refurbishment of existing roof | Completed | Tuffin Ferraby Taylor - Construction Consultant |
307 | London Wall | Brookfield Multiplex | £1.2m | April 16 - Aug 18 | Joinery, Ironmongery, Signage - Design & Build | Ongoing | Aidan Lucas - Project Manager; Antony McSharry - Project Surveyor |
308 | Basingstoke Police Investigation Centre | Mace Group | £1.0m | June 16 - Dec 16 | Internal Doors, Skirting, Window Boards and Washroom Fit-Out | Completed | Andrew Palmer - Project Manager; Simon Griffith - Project Surveyor | 314 | LDP Farringdon Road | Brookfield Multiplex | £500k | Aug 17 - Dec 18 | Internal Doors, Skirting & Washroom Fit Out | Ongoing | Elliot Dittes - Project Manager; Joyce Canonigo - Project Surveyor |
316 | Camden Town Hall Annexe | McLaren | Oct 17- | Timber Doorsets | Ongoing | Gareth Hill - Project Manager; Clare Theobald - Project Surveyor | 320 | Station Road, Cambridge | Galliford Try | £1.6m | Mar 18 - June 18 | Ceilings & Partitions to offices over several floors | Completed | Gareth Hill - Project Manager; Andrew Every - Project Surveyor |
322 | New Eastern Police Investigation Centre | Mace Group | £1.8m | June 18- May 19 | Timber & Metal Doors,Cell Furniture, desks and washroom fit-out | Completed | Andrew Palmer - Project Manager; Richard Ashman - Project Surveyor | 328 | Chatham Waters | O'Halloran & O'Brien | £1.2m | Oct 19 - | Joinery & Fit-Out | Ongoing | Zaid Abioye - Project Manager; Steve McKenna - Project Surveyor |
329 | We Works Hamburg | AC PLC | £265k | Oct 19 - Jan 20 | Joinery Units | Completed | Casey Atkinson - Project Manager; Kevin Pettipher - Project Surveyor |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
141 | Royal Academy of Dramatic Arts, London | Laing | £824K | 2000 | Carpentry, Joinery, Doors, Wood Flooring and Panelling | Completed | Brian Wolding - Quantity Surveyor |
153 | Millennium School & Health Centre, Greenwich, SE10 | Wates Const | £351K | 2001 | External Timber Cladding | Completed | Andy Wall; Nigel Smith |
181 | Priors Court School | The Andrews Partnership | £141K | 2001-2002 | General Refurbishment of the Early Years Centre(2 no. Buildings) | Completed | Laura Brampton |
189 | Charterhouse School Godalming, Surrey | GTCM | £227K | Jul 02-Sep 02 | Joinery Refurbishment of Dormitary's | Completed | Andrew Healey - Quantity Surveyor |
230 | John Madejski Academy, Reading | Costain | £716K | Jul 06-Jan 07 | Doors, Frame and General Joinery | Completed | Richard Tranter - Project Manager; Alan Kittles - Quantity Surveyor |
253 | Teddington Secondary School | Mace Plus | £1.32M | Jul 09-Aug 10 | Kerto Roofing, General Joinery and WC Fit Out | Completed | John Fraser - Project Manager Liam Donoher - Quantity Surveyor |
256 | Wren Academy | Galliford Try | £428K | Jul 09-Sep 10 | General Joinery and External Timber Cladding | Completed | Vince Sherwin - Project Manager Andrew Every - Quantity Surveyor |
262 | Garth Hill College | Mace Plus | £1.2M | Oct 09-Sep 10 | Doors, Joinery, Screens Windows and Tiling | Completed | Alistar Kendall - Project Manager, Ryan King - Quantity Surveyor |
263 | Sainsbury Laboratory | Kier/Cambridge University | £1.7M | Mar 10-Feb 11 | Timber/Metal Door Sets, Joinery, Panelling | Completed | Nick Mann - Project Manager; Iain Cox - Quantity Surveyor |
265 | OMPI (Oxford Molecular Pathology Institute) | Mace Plus | £450K | Aug 10-Dec 10 | Doors, WC fitout, Cedar furniture | Completed | Phil Hilton - Project Manager, Tom Hunter Quantity Surveyor |
270 | University of Hartfordshire (Hatfield) | ISG | £210K | Feb 11-Jul 11 | Doors, Acoustic Wall Panels, general Joinery | Completed | James Barbwell - Project Manager, Michael Dempsey Quantity Surveyor |
275 | Waltham Forest | Mace Plus | £2.2M | Jul 11-Sep 11 | General refurbishment of 4 separate school buildings | Completed | Andrew Palmer - Project Manager, Lance Lucas - Quantity Surveyor |
278 | Southfields Community College 1st Phase | Lend Lease | £400K | Jul 12 - Jan 13 | Doors, glazed screens, desks,display cabinets, seats | Completed | Roger Hirst - Project Director |
282 | Southfields Community College 2nd Phase | Lend Lease | £330K | Jul 13 - Feb 14 |
Doors, glazed screens, desks, display cabinets, seats | Completed | Roger Hirst - Project Director |
285 | Barnet Schools Phase 1 |
Mace Plus | £730K | Jul 13- Aug 13 |
M&E, roofing, plastering, flooring, ceilings, partitions, door sets, cubicles, wall tiles and decoration | Completed | |
288 |
Barnet Schools Phase 2-5 |
Mace Plus |
£717k |
Dec 13- Apr 14 |
Carpentry & Joinery |
Completed |
Ian Thomas - Project Manager, Liam Donoher - Quantity Surveyor |
296 | ARK Academy |
Lend Lease | £575K | Nov 14- July 15 |
Internal Joinery and Tiling | Completed | John Fifield - Project Manager, Max Atkinson - Quantity Surveyor |
298 |
St John Bosco College |
Lend Lease |
£485k |
Nov 14-Sep 15 |
Cedar Cladding to Sports Hall Curved Timber Chapel Wall and Internal Joinery | Completed | John Trainer |
299 | Marlborough Interim School |
Mace | Completed | Roy Conway | |||
304 | Exeter College Oxford | Mace | £1.25m | April 16 - April 17 |
Joinery including Panelling, Doors and Glazed Screens | Completed | Garrett Wier - Project Manager |
310 | Big Data Institute Oxford |
Mace | £1.1m | May 16 - Feb 17 |
Timber Panelling, Internal Doors & Bespoke Joinery | Completed | Phil Hilton - Project Director Liam Donoher - Quantity Surveyor |
313 | New Marlborough School & Commercial Building | Mace | £1.36M | Feb 17 - Sep 17 |
Joinery including Acoustic Panelling, Doors, Reception Desk & Washroom Fit-out | Completed | James Cain - Project Manager |
318 | Oxford Amenities, Project 696 |
Mace | £846k | Feb 18 - December 18 |
Internal Carpentry & Joinery | Completed | Robert Cocks - Project Director David Vinton - Quantity Surveyor |
321 | UCL New Student Centre | Mace | £2M | June 18 - December 18 |
Reception Desk, gazed Screens, changing benches, tea points,Cafe Servery & Washroom Fitout | Completed | Craig Herbert - Project Manager, Steven Anderson - Project Surveyor |
321 | RFI Harwell |
Mace | £800k | Mar 20 - |
Internal Carpentry,Joinery & Doors | Ongoing | Simon Allen - Project Manager, John Mead - Project Surveyor |
332 | The Marshall Building LSE | Mace | £6.3m | Oct 20 - |
Timber Doors & Screen, Slatted Acoustic Panelling, Bespoke Furniture, WC Cubicles, Skirtings, Veneered Panelling, Bespoke Double Height Wall | Ongoing | Harish Ragwhani - Project Manager, Liam Donoher - Project Surveyor |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
217 | Gatwick Pier 1 | Rokbuild Ltd | 134K | Apr 04-Nov 04 | Carpentry & Joinery Fit Out | Competed | |
226 | Heathrow T5 Baggage Accommodation | Mace | £839K | Oct 05-Nov 07 | Fit Out | Completed | Tonya Sanni - Project Manager; Adam Cartright - Quantity Surveyor |
235 | Heathrow T5 - CIP Lounge | Mace | £1.84M | Jan 07-May 08 | Doors, Frames, General Joinery and Fit Out | Completed | Andrew Butterworth - Package Manager; Simon Hoarsley - Project Manager;Anthony Sexton - Commercial Manager |
246 | Heathrow T3 - Transformation Room | Morgan Ashurst | £52K | Apr 08-Sep 08 | General Builderswork & Fit Out | Completed | Alan Smith - Project Manager; Neil Reynolds - Quantity Surveyor |
251 | Heathrow T3 - Virgin COGS | Morgan Ashurst | £80K | Nov 08-Jan 09 | General Builderswork | Completed | Rob Liddle - Project Manager; Richard Hawkins - Quantity Surveyor |
295 | AOF Snowbase (Heathrow) | Mace | £159K | Sep 14-May 15 | Internal Joinery | Completed | Roshan Ratnapala - Project Manager, Charles Dupigny - Quantity Surveyor |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
216 | Broadmoor Hospital Crowthorne | Costain | £2.5M | Mar 04-Apr 06 | Doors, Frames, General Joinery and Roof | Completed | Gareth Williams - Project Manager - Left Costain; Paul Houlton - Quantity Surveyor |
222 | Queen Mary's Hospital Roehampton | Bovis Lend Lease | £2.11M | Nov 04-Mar 06 | Carpentry and Joinery | Completed | Chris Howcroft; Jonathan Lossyk |
221 | Diamond Laboratory Building Synchrotron - Didcot | Costain | £600K | Jan 05-Apr 06 | Doors, Frames and General Joinery | Completed | Dave Williams - Project Manager; Alan Kittles - Quantity Surveyor |
225 | ISIS Laboratory, Didcot | Costain | £205K | Jan 06-Nov 06 | Doors, Frames and General Joinery | Completed | Agency Manager; Alan Kittles - Quantity Surveyor |
231 | GlaxoSmithKline Laboratory | Bovis Pharmaceutical | £156K | May-06 to | General Builderswork | Completed | Paul Symes - Quantity Surveyor |
236 | Cancer Research Facility Oxford | Mace Plus | £2.39M | Jan 07-Jan 08 | General Builderswork, Carpentry, Joinery, Specialist Furniture | Completed | Warren Pickance - Project Manager; Kevin Pettipher - Quantity Surveyor |
259 | Broadmoor Hospital | Quion Contracts/ Direct | £5K | Jul 09-Dec 09 | Refurbishment Works | Completed | Simon Lowe - Project Manager |
280 | Chelsea & Westminster Hospital - Burns & Diagnostics Ward | Mace | £1.2M | Oct 12-Aug 13 | Doors, Frames Specialist & General Joinery | Completed | Darren Pope - Project Manager |
287 | Chelsea & Westminster Hospital - Adult Burns Ward | Mace | £352K | Oct 13 - Feb 14 | Internal fixtures, Fittings and Joinery | Completed | Darren Pope - Project Manager |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
173 | Red Square, London | Ballymore | £801K | 2001-2002 | Carpentry and Joinery Works | Completed | |
168 | Silverthorne Triangle | Bovis Construction | £1.2M | 2001-2002 | Carpentry and Joinery Works | Completed | |
209 | 199 Knightsbridge, SW1 | Brookfield Multiplex | £7.8M | 2003-2005 | Doors, Frames, General Joinery to 207 Units Timber Decking and Staircases | Completed | Ryan Mitchell; Steve Brown - Quantity Surveyor |
238 | Regent Street, W1 | Sir Robert McAlpine | £950K | Apr 07-Jul 08 | Fit Out of 7 Units | Completed | Geoff Teeling; Nigel Chard |
249 | Abbey Mill House, Reading | Galliford Try | £811K | Sep 08-Feb 09 | Carpentry & Joinery | Completed | Jerry Simms - Project Manager; Daniel Fox - Quantity Surveyor |
269 | The White House | Julian Mountain | £595k | Nov 10-Oct 11 | Sub/Super structure, and complete fitout | Completed | Julian Mountain - Project Manager, Richard Tait-Quantity Surveyor |
286B |
Foyle's Residential |
Mace |
£800k |
Nov 13 - |
Doorsets, general joinery, WC fit out and flooring |
Completed |
|
291 |
Harpenden |
Andy Scarlett |
Mar 14 - SEp 15 |
Superstructure and fit out |
Completed |
||
292 |
HMS Nelson, Portsmouth |
Lend Lease |
£470k |
Nov 13- Jan 15 |
Internal Joinery |
Completed |
Ali Azir - Project Manager, Clive Brandon - Quantity Surveyor |
293 |
Harpenden |
Andy Scarlett |
July 14 - Sep 15 |
Superstructure and fit out |
Completed |
||
294 |
Ram Brewery |
Brookfield Multiplex |
£443k |
July 14- Nov 14 |
Full relocation of Nano Brewery, Marketing Suite for residentials |
Completed |
Kevin Lock - Project Manager, Adam Moore - Quantity Surveyor |
289 | Surrey Lane Appartments | Lendlease | £695k |
Nov 14-June 15 |
Doorsets, general joinery, WC fit out and timber decking |
Completed | John Trainer |
302 |
The Glebe |
Brookfield Multiplex |
Roofing | Ongoing | Sean Theobald - Project Manager, Kevin Coyle - Quantity Surveyor |
||
315 | Lollard Street | Canary Wharf Contractors | £890K |
July 17- Dec 17 |
Joinery and Timber Doors |
Completed | Scott Nicholas - Project Executive, Frank Cowell - Project Manager |
326 |
Good Luck Hope |
Ballymore |
£366K |
Feb 19 - |
Roofing Carpentry | Ongoing | Henry Stevens - Project Manager, Adam Button - Project Surveyor |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
122 | John Lewis, Bluewater | Bovis Land Lease | £1.6M | 2000-2002 | Carpentry, Joinery, Builderwork and Toilet Fit Out | Completed | Phil Clarke - Project Manager; Mark Chennery - Quantity Surveyor |
162 | Lexus Showroom, Tunbridge Wells | N/A | £84K | Nov 00-May 01 | Carpentry and Joinery Works | Completed | |
196 | Croydon Centrale Shopping Village | Bovis Land Lease | £237K | Jan 03-Jun 03 | Toilet Fit Out | Completed | John Pryce - Design Manager; Stephen Dix - Quantity Surveyor |
218 | Westwood Cross Thanet | Carillion | £466K | Aug 04-Feb 05 | Carpentry, Joinery and Fit Out | Completed | Alistair Mitchell - Project Manager |
219 | Mercedes After Sales Centre Woking | Carillion | £90K | Jul 04-Oct 04 | Carpentry and Joinery Works | Completed | Steve Clarke - Quantity Surveyor |
N/A | Various Tesco, Safeway and Marks and Spencer Stores | Various Contractors | £75K-£175K | N/A | Carpentry and Joinery Works | Completed | Warren Pickance - Project Manager; Kevin Pettipher - Quantity Surveyor |
264 | Daniels Store - Windsor | Galiford Try | £55K | Jan 11-Mar 11 | Carpentry and Joinery Works | Completed | Colin Jones |
276 | Clarence Street | Galiford Try | £22.5K | Jan 12-Feb 12 | Carpentry and Joinery Works | Completed | Ray Willis |
286A | Foyle's Bookshop | Mace | £650K | Nov 13- May 14 | Doorsets, general joinery and WC fit out | Completed | Finlay O'Sullivan - Project Manager; Ian Cruikshank - Quantity Surveyor |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
210 | HWDC, Project Wand Langley | Mowlem | £1.62M | Oct 01-Jun 02 | Doors, Frames, General Joinery and Fit Out to New Post Office Main Distribution Centre | Competed | Richard Tindal - Project Manager |
223 | Worle Magistrates Courts Weston Super Mare | Mowlem | £555K | Jul 05-Dec 05 | Doors, Frames and General Joinery to New Courthouse | Completed | Richard Tindal - Project Manager; Toby Conroy - Quantity Surveyor |
227 | Bristol Magistrates Court Bristol | Mowlem/Carillion | £987K | Feb 06-Apr 07 | Doors, Frames and General Joinery to New Courthouse | Completed | Pat Duggan - Project Manager; Rob Wardlkow & Brian Boden - Quantity Surveyor |
237 | London Library, SW1 | Mace Limited | £610K | Jan 07-Sep 07 | Fit Out Works | Completed | Mark Johnson; Bob Mayer |
245 | Denham Depot, Middlesex | Carillion Highways | £114K | Apr 08-Jun 08 | Refurbishment Works | Completed | Dave Roberts |
252 | Service Depot M25 Leatherhead, Surrey | Carillion | £19K | Jan 09-Feb 09 | Refurbishment of Toilets | Completed | Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor |
257 | Service Depot M25 Sunbury, Middlesex | Carillion | £40K | Jul 09-Sep 09 | Toilet and Kitchen Fit Out | Completed | Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor |
258 | Service Depot M25 Blunts Farm, Essex | Carillion | £20K | Jul 09-Sep 09 | Kitchen Fit Out | Completed | Dave Roberts - Project Manager; Steve Clarke - Quantity Surveyor |
268 | Negative Earth | Galliford Try | £60K | Jul 10-Sep 10 | Doors Skirtings Window boards | Completed | Ray Willis - Project Manager, Neil Ware - Quantity Surveyor |
272 | Cherwell Valley | Galliford Try | £110K | Apr 11-Sep 11 | Doorsets, WC fit out, Kitchen Fitout, general joinery | Completed | Ray Willis - Project Manager, Ian Wren - Quantity Surveyor |
284 | Salfords Custody Suite | Mace | £340K | Jul 13 - Sep 13 |
Timber & Metal Door Sets, General Joinery, Specialist Desks | Completed | David Rogerson - Project Manager, Oliver Stent - Project Surveyor |
289 | The Lyric Theatre - Hammersmith | Mace | £700k | Apr 14- Jan 15 | Doorsets, WC fit out, general joinery and flooring | Completed | Andy Griffiths - Project Manager; Matt Wright - Commercial Manager |
300 | South Bank Tower | Mace | £1.36m | Aug 15 - Apr 16 |
Walnut Frames & Door Sets, Glazed Partitions, Window Reveals & Casings | Completed | Shaun Tate - Project Manager, Joseph Gilman - Project Surveyor |
317 | 245 Hammersmith Road | Lendlease | £800K | Dec 18 - | Carpentry and Joinery | Ongoing | John Chesters - Project Manager, James Bell - Quantity Surveyor |
319 | Beaverbrook Spa Leatherhead | Rise | £3m | Jan 18 - Dec 18 |
Window and door refurbishment, tiling, decoration, drylining and joinery roofing works | Completed | Joe Hacke - Project Manager, James Stokes - Project Surveyor | 324 | RHS Wisley Gardens | Buckingham Group | £153k | Dec 18 - Feb 19 | Window boards, door sets, timber access panels, kitchen units, worktops, splashbacks, ironmongery | Completed | Bret Kanjurs - Project Manager, Paul Tilbrook - Project Surveyor |
Ref | Project | Client | Value | Programme | Scope of Works | Status | Contact |
113 | Smithfield Market | Taylor Woodrow | £1.25M | 1997-1998 | Roof restoration/refurbishment | Competed | Pat Hannon |
123 | Fleet Street | Kier | £1.01M | 2002-2003 | Windows/Panelled Door refurbishment | Completed | Sarah Crosley |
169 | Finsbury Circus | Bovis Lend Lease | £1.5M | 2006-2007 | Listed façade refurbishment & new sliding windows | Completed | Andy Lee |
131 | St Johns Church | Mowlem | £101K | 2003 | Internal joinery refurbishment | Completed | John White |
117 | The Great Eastern Hotel | Laing | £5M | 1998-1999 | Internal joinery refurbishment | Completed | Disbanded |
129 | Guildford High Street | Walter Lllewellyn | £50K | 2003 | Listed façade & internal joinery refurbishment | Completed | David Fisher |
126 | Charterhouse School | G & T Construction Management | £214K | 2003 | Internal bedroom/dormitary joinery refurbishment | Completed | Andrew Healy |
274 | Hardinge Barracks | Bovis Lend Lease | £649K | 2012-2013 | External sash windows renovations and internal joinery | Completed | Mark Norton |
277 | Bodleian Library | Mace | £633K | May 13- May 15 | External Windows Renovations | Completed | Tim Court |
281 | Bodleian Library | Mace | £3M | May 13- May 15 | Timber Wall Panelling, Timber ceilings, Cabinetry, Skirtings, Meatal & Timber Door Sets, Lecture Theatre Fit Out | Completed | Tim Court |
283 | Hounslow Officers Mess | Bovis Lend Lease | £135K | Apr 13-Sep 13 | Strip-Out and Restoration | Completed | Mark Norton |
290 | Hounslow Officer's Mess | Bovis Lend Lease | £460K | Jan 14- Jan 15 | External sash window renovation and replacement | Completed | Mark Norton - Project Manager; Natalie Keogan - Quantity Surveyor |
297 | Hounslow Officers Mess | Lend Lease | £600K | Nov 14- July 15 | Internal joinery refurbishment | Completed | James Myers |
312 | Royal Opera House | Rise | £5.2m | Sep 16 -Aug 18 | Fit-out & Joinery | Completed | Joe Hacke - Project Director; Nigel Fellows - Project Surveyor |