Key Facts

  • Client Name:
    Lyric Theatre
  • Principal Contractor:
    MACE Group
  • Architect:
    Mace Design
  • Address:
    Lyric Square
    Hammersmith
    W6 0QL
  • Value of Works:
    £700,000
  • Start Date:
    June 2014
  • End Date:
    December 2014

Project Description

The Lyric Theatre was a part refurbishment, part new build theatre renovation in Hammersmith. Our package consisted of both an internal joinery and toilet fit out.

Our works included the refurbishment of the existing entrance foyer timber flooring. However it became apparent on closer inspection that patches of the flooring were beyond repair and we were left with no other option than to replace small sections with new. This represented a problem of matching the new timber flooring with the existing 50 year old floor. We overcame this issue by gaining expert advice on timber treatments and utilizing professional flooring contractors to ensure a true and consistent finish was achieved throughout the entrance foyer. The entrance Foyer was of high importance to the client and they were particularly pleased with the finished product.

Scope of Works

Joinery & fit-out works including:
  • New and refurbishment of existing doorsets
  • New and refurbishment of hardwood timber floor
  • Windowboards & Skirting
  • Hardwood acoustic feature wall panelling
  • Cinema seating and tiered floors
  • Dance and theatre studio floors
  • High acoustic doorsets for studio areas
  • New toilet cubicles, tiling to toilet areas, vanity units and mirrors