Key Facts

  • Client Name:
    Leamouth General Partnership Ltd
  • Principal Contractor:
    Ballymore
  • Architect:
    Allies & Morrison/Todd Architects
  • Address:
    Orchard Place
    London
    E14 0JZ
  • Type of Contract:
    Design and Build
  • Value of Works:
    £3.9M
  • Start Date:
    March 2019
  • End Date:
    August 2020

Project Description

The Goodluck Hope project is situated in Leamouth South on the Thames overlooking the 02 in Greenwich. The development consists of nine residential apartment blocks mixed with commercial & social facilities within the ground floor areas.

Swift Crafted carried out roof carpentry, roof covering & waterproofing to phase 1. The roof covering consisted of consisted of PPC capping’s, pitched roof Kalzip install, single ply covering install, flat roof waterproofing and all flat roof finishes.

Upon completion of phase 1, Swift Crafted was instructed to complete the roof carpentry, structural steel work & roof coverings to phase 2. This consisted of two blocks (F & G) as well as temporary waterproofing to allow early fit out commencement to all remaining blocks at Goodluck Hope.

Scope of Works

Joinery & Fit-out works including:

  • Alumasc hotmelt waterproofing to Blocks K & F
  • Hotmelt roof covering to JKL podium area
  • Admaster panels. (SIP Panels)
  • Liquid waterproofing to blocks F,G,J,K & L
  • Kalzip roof covering to blocks F,G,J,K & L
  • Single ply roof coverings to roof valleys & dormer flat roofs
  • Paving to Blocks F & K flat roof area
  • Roof trusses & First fix roof carpentry to Blocks F & G
  • Structural steel work to Block G
  • PPC cappings to Blocks F & G
  • Hardwood timber decking including subframe to Block G
  • Brown roof coverings to block F
  • Supply & installation of all roof mansafe systems

Good Luck Hope Gallery